Properties
Properties
- Container
- D25061: Fix editing a Calendar import ICS URI
- Buildable
- Diff 301
- Origin
- Automatic Buildable
Time | Test | |
---|---|---|
77 ms | PhabricatorCelerityTestCase::testCelerityMaps Assertion failed, expected 'true' (at PhabricatorCelerityTestCase.php:32): When this test fails, it means the Celerity resource map is out of date. Run `bin/celerity map` to rebuild it.
ACTUAL VALUE
| |
0 ms | CalendarTimeUtilTestCase::testTimestampsAtMidnight 7 assertions passed. | |
2 ms | CalendarTimeUtilTestCase::testTimestampsStartDay 14 assertions passed. | |
9 ms | PhabricatorConduitTestCase::testConduitMethods 1 assertion passed. | |
0 ms | PhabricatorInfrastructureTestCase::testApplicationsInstalled 1 assertion passed. | |
View Full Test Results (1 Failed · 8 Passed) |
Builds
Builds